Refinery electrical equipment often sits within tightly controlled operating areas and may require coordination across operations, maintenance, and site safety teams. Nameplate data is important, but the asset's release status and surrounding hazards also shape the project.
Identify the scope
Separate transformers, switchgear, controls, and ancillary equipment in the inventory. Note the electrical ratings and which associated cabinets or cooling components are included.
Refinery safety coordination
Describe permit-to-work requirements, restricted zones, and any known process residues or contamination. Isolation and hazard assessment must be performed by the responsible qualified site personnel and contractors.
Shutdown and lifting
A refinery may release equipment only during a defined shutdown window or after adjacent systems are secured. Provide expected dates, lifting restrictions, and the path from the installation to a suitable loading point.
What to send with your inquiry
- Provide an itemized asset list with ratings and included accessories.
- Identify site access, permit, and known contamination requirements.
- Share the shutdown window and loading or crane restrictions.
We pay upfront and cover freight for purchased equipment. The owner and qualified personnel are responsible for a safe electrical release; any additional site work is agreed separately.
